Commercial, strata and developments

Commercial electrical, from the switchboard room to the street

Main switchboards, generator supply, feeders, metering and Level 2 connections for builders, developers, strata schemes and property managers. 16+ years in Sydney, and the accreditation to do the network side ourselves.

Capabilities

What we deliver on commercial sites

Main switchboards and distribution

Custom main switchboards built to the consultant single-line diagrams, distribution boards, surge protection and board relocations during fit-out.

Generators and backup power

Generator boards, changeover arrangements, and the removal of temporary generators and battery banks once permanent supply is live.

Feeders and fire-rated cabling

Large three-phase XLPE feeders for lifts and plant, cable size upgrades, and replacement of damaged fire-rated cable runs.

Level 2 connections and temporary supply

Builder’s supply, disconnections, new connections and energising done in-house under ASP No. 2360, without waiting on a separate provider.

Metering and NCC Section J

Tenancy metering, energy metering and energy management scopes under the National Construction Code, coordinated with certifiers ahead of occupation.

EV charging for car parks

Charger scope, load management and supply capacity for residential and commercial car parks.

Commercial solar and storage

Rooftop systems and batteries for warehouses, retail, strata common property and schools, sized on your daytime load.

Strata and landlord compliance

Smoke alarm certification, Certificates of Compliance, common-area lighting and meter room work, with paperwork sent straight to the agent.

Developer partner

Electrical contractor for JQZ's Sydney developments

JQZ is a Sydney property developer with more than 20 delivered projects, from residential towers to offices, retail precincts and hotels, and international awards for tall-building design. We have delivered the electrical works on their projects, from four-tower apartment communities to a 14-level office building and the current One City Square precinct.

Developments
12
Apartments
4,500+
m² commercial and retail
80,000+
Delivering since
2016
  • Due 2028

    One City Square

    57–83 Church Street, Parramatta

    Hotel and mixed-use

    497 apartments

    • 12-level hotel
    • About 22,600 m² commercial
    • Dining and retail piazza
    Our scope on this project
  • Due Late 2026

    Origami

    55 Grafton Street, Bondi Junction

    Mixed-use

    88 apartments

    • $500M+ development
    • Residences and workspace
  • Due 2026

    Park Avenue Residences

    Park Road and Berry Road, St Leonards

    Residential

    306 apartments

    • Four buildings
    • 4 to 10 levels
  • Completed 2023

    Eighty Eight

    88 Christie Street, St Leonards

    Mixed-use

    654 apartments

    • About 30,000 m² retail and commercial
    • Supermarket and public library
    • Civic plaza
  • Completed 2023

    558 Pacific Highway

    558 Pacific Highway, St Leonards

    Commercial

    16,738

    • 14-level office building
    • 16,738 m² net lettable area
    • Seven lifts
  • Completed 2025

    Vivacity Stage 2

    5 Uhrig Road, Lidcombe

    Mixed-use

    584 apartments

    • About 4,550 m² commercial and retail
  • Completed 2025

    Vivacity Commercial

    5 Uhrig Road, Sydney Olympic Park

    Commercial

    2,950

    • Six storeys
    • About 2,950 m² strata offices
  • Completed 2020

    Vivacity Stage 1

    5 Uhrig Road, Lidcombe

    Residential

    561 apartments

    • Four buildings
  • Completed 2019

    Prime

    101 Waterloo Road, Macquarie Park

    Mixed-use

    680 apartments

    • Four towers
    • 1,800 m² retail
  • Completed 2019

    Ramsgate Park

    200 Rocky Point Road, Kogarah

    Residential

    534 apartments

    • Apartments and terrace homes
    • Former Darrell Lea factory site
  • Completed 2018

    Emblem

    52–54 O’Dea Avenue, Waterloo

    Mixed-use

    345 apartments

    • 2,382 m² retail
    • CTBUH 2019 Award of Excellence
  • Completed 2016

    Grand Central

    2–20 Parramatta Road, Homebush

    Mixed-use

    430 apartments

    • 1,370 m² commercial and retail
    • 3,680 m² public park

Project facts from JQZ and public listings.

Projects

Project write-ups

Real jobs from our books, delivered by our team under No. 1 Electrical Service Pty Ltd and our sister company Jimmy Group Pty Ltd. Scope is listed exactly as quoted, invoiced and certified. Contract values are kept private.

Church Street, Parramatta, with the light rail line, near the One City Square site
Photo: Nick-D, Wikimedia Commons, CC BY-SA 4.0
In progress
Commercial and hotel · 2024 to present

One City Square hotel and podium

83 Church Street, Parramatta

Main switchboards, generator supply, lift supply cabling and metering for the hotel and podium of a master-planned CBD precinct. Our largest current project.

One City Square is a master-planned precinct by developer JQZ on a full city block at 57 to 83 Church Street, Parramatta: several residential towers, around 22,600 square metres of commercial space, a dining and retail piazza and a 12-level hotel, under construction with completion expected in 2028.

What we did

  • Supply and installation of the hotel main switchboards (MSB 1, 2 and 3) built to the consultant single-line diagrams, with surge protection on the incoming supply
  • Generator board supply and installation, and the disconnection and removal of the temporary generators and battery bank once permanent power was live
  • Temporary builder’s supply and the changeover to permanent supply, done in-house as a Level 2 Accredited Service Provider
  • 200 amp three-phase XLPE feeders from the tower main switchboard to the hotel lifts, about 130 metres
  • Upgrading a 60 metre 185 mm² XLPE run to 240 mm² between the surge protection and the hotel tenancy main switchboard
  • Replacement of damaged 400 mm² fire-rated cable runs
  • Relocating three distribution boards across the first floor, second floor and basement to make way for a lift
  • Coordination of the EV charger scope for the car park
  • Energy metering and energy management system scope under National Construction Code Section J (J9D3) for the non-hotel areas, coordinated with the certifier ahead of occupation
  • Progress claims, variations and site coordination with the builder, consultants and switchboard manufacturer
Main switchboards
3
Lift feeder
200 A, 3-phase
Hotel
12 levels
Completion
2028
Darling Street, Balmain, near North Street
Photo: Hpeterswald, Wikimedia Commons, CC BY-SA 3.0
Completed
New build · 2024 to 2026

New residence with solar, Balmain

12 North Street, Balmain

Full electrical services for a new home in a heritage conservation area, from disconnection of the old dwelling to solar and the occupation certificate.

A knock-down rebuild on a tight Balmain block under Inner West Council consent, delivered with a project builder. Sites like this need the network side handled as carefully as the house wiring: the old service must be formally disconnected before demolition, the builder needs temporary power, and the new connection has to be in place for the occupation certificate.

What we did

  • Level 2 disconnection of the existing dwelling ahead of demolition, with advice on the private pole option for the new connection
  • Electrical services contract for the new build, including the ensuite and first-floor bedroom additions during construction
  • Solar inverter installation and commissioning on completion
  • Certificates of Compliance for Electrical Work and the documentation needed for the occupation certificate, which was approved in August 2026
  • Works zone and council coordination during the build
Consent
Inner West Council
Occupation certificate
Aug 2026
Solar
Installed
In progress
New build · 2025 to present

Knock-down rebuild, Balmain East

3 Nicholson Street, Balmain East

Electrical planning for a new home on the Balmain East peninsula, coordinated with the structural, stormwater and driveway design consultants.

A rebuild on a 417 square metre block a few streets from the Darling Street wharf. Peninsula sites combine heritage streetscapes, narrow access and overhead services, so the electrical connection is designed alongside the civil and structural work rather than left to the end.

What we did

  • Electrical design input alongside the structural, stormwater and driveway consultants
  • Planning of the new service connection and switchboard location for the completed home
  • Coordination of long-lead items with the builder and suppliers
Block
417 m²
Stage
Design and approvals
In progress
Level 2 connection · 2026

New power connection, Connells Point

Queens Road, Connells Point

Level 2 power connection works for a property in the St George area, delivered to the client’s drawings with scope managed in writing.

A residential site on the Georges River side of Connells Point. Connection work here runs from the street network to the meter, which only a Level 2 Accredited Service Provider may carry out, and it has to be sequenced with the rest of the build.

What we did

  • Power connection works to the client’s drawings, with anything outside the connection scope identified in writing and quoted separately
  • Coordination with the electricity retailer on the supply and account
Network
Ausgrid
Work type
Level 2 ASP
Completed
Level 2 compliance · 2025

Network defect notice rectification

Sydney

Two network defect notices on one property rectified, certified and closed out with the network operator’s safety defect team.

Network operators issue defect notices when the customer-side connection equipment is unsafe: private poles, service brackets, points of attachment or consumer mains. The owner is required to have the defects fixed by an accredited Level 2 contractor and to provide the compliance documentation.

What we did

  • Inspection and rectification of the defects listed in two notices on the same service
  • Certificate of Compliance for Electrical Work issued and lodged with the safety defect team so the notices could be closed
Notices
2
Outcome
Closed
Ongoing
Strata and property management · Ongoing

Landlord and strata compliance certificates

Sydney-wide

Smoke alarm certification and Certificates of Compliance for Electrical Work for property managers, landlords and owners corporations.

NSW landlords must have working smoke alarms checked annually and any electrical work certified. Property managers need the paperwork quickly and in a form they can file against the tenancy. We issue the certificates the same day the work is done and send them straight to the agent.

What we did

  • Smoke alarm installation, testing and annual certification for rental properties
  • Certificates of Compliance for Electrical Work issued to agents and owners on completion
  • Common-area lighting, meter room and switchboard work for strata schemes
Turnaround
Same day
Sent to
Your agent

Street photographs are openly licensed images credited beneath each. Site photographs of our own switchboard rooms and installations are being added.

Who we work with

Built for the people who run the job

Builders and developers

One contractor for the building wiring and the network connection. Quotes in writing, variations documented, progress claims that match the program.

Strata managers and owners corporations

Meter rooms, main switchboards, common-area lighting, EV charging and defect rectification, with options presented to committees in plain English.

Property managers and landlords

Same-day compliance certificates, smoke alarm checks and repairs across a portfolio, with one contact and one invoice per property.

Consultants and certifiers

We work to your drawings and your inspection schedule, flag scope gaps early, and issue the certificates you need to sign off.

Why it works

Both sides of the meter, one contractor

On a commercial site the network connection is on the critical path: temporary supply for the builder, then permanent supply, metering and energising before occupation. Most electrical contractors have to book a separate Level 2 provider for each of those steps and wait.

We hold the contractor licence and the Level 2 accreditation, so those steps sit inside our program, not someone else’s. On One City Square that meant the changeover from generators to permanent supply was scheduled by the same crew installing the switchboards it fed.

  • Switchboards built to consultant drawings and installed by us
  • Temporary and permanent connections in-house
  • Variations and scope gaps flagged in writing before work
  • Certificates issued for every stage, ready for the certifier
  • Out-of-hours work for tenanted and trading sites
  • English and 中文 on site and in meetings
Questions

Commercial FAQs

What size of commercial job do you take on?

From a single shop fit-out to hotel and mixed-use projects with multiple main switchboards. If the job needs more crew than we carry, we say so at quote stage rather than stretching.

Do you handle the network connection as well as the building wiring?

Yes. We are a Level 2 Accredited Service Provider (ASP No. 2360), so temporary builder’s supply, disconnections, permanent connections and energising are all done by us.

Can you work with our consultant’s drawings and switchboard manufacturer?

That is how most of our commercial work runs: single-line diagrams and layouts from the consultant, boards from a switchboard builder to those drawings, and installation and certification by us.

How do you deal with variations?

In writing, before the work. If something falls outside the agreed scope, you get a quote for it and the choice to include it now or in a later order.

Do you work out of hours for tenanted buildings?

Yes. Outages and noisy work can be scheduled early, late or on weekends to suit tenants and trading hours.

Request a tender or quote

Tell us the site, the stage and what you need. Drawings can follow by email.

What do you need?
About the job

A photo of your switchboard, meter box or notice helps us quote faster

Your details

No obligation. We confirm details and pricing before any work. Prefer to talk? Call 0414 146 027.

Tender documents and drawings: email no.1electricalservice@gmail.com.

Ready when you are

Have a commercial or strata job coming up?

Call to talk through the scope, or send the drawings and we will come back with a written price.