Everything to do with your electricity meter and getting a new installation switched on. We install, upgrade, relocate and replace metering, and energise new connections so you can move in or open your doors on schedule.
Upgrading from single-phase to three-phase is one of our most requested jobs. It's often needed for ducted air conditioning, EV charging, workshops, pools and commercial equipment. We assess your load, upgrade the metering and consumer mains, and coordinate the changeover with the network operator and your retailer.
Building a new home or granny flat, or splitting a property into units? We install the metering and energise the site so the installation can be commissioned.
What's included
- New meter installation for homes, units and granny flats
- Single-phase to three-phase upgrades
- Meter relocation, for example moving a meter box during a renovation
- Meter box and panel upgrades
- Energising new connections and temporary builder's supply
- Off-peak and controlled-load wiring
- Load assessments for EV chargers and air conditioning
Frequently asked questions
Do I need three-phase power?
You may if you're adding ducted air conditioning, a fast EV charger, a pool heat pump or workshop machinery, or if your switchboard keeps tripping under load. We can assess your current supply and tell you honestly whether an upgrade makes sense.
Who do I contact about a new meter: you, my retailer or the network?
Start with us. We'll tell you what needs to happen and in what order, do the Level 2 work, and let you know exactly what to ask your electricity retailer for.