Upgrading to three-phase power in Sydney: signs, process and costs

When a home or small business needs three-phase power, the steps involved, and what affects the price of the upgrade.

Most Sydney homes are supplied with single-phase power. That was plenty when houses had a stove, a hot water system and a few appliances. Today many homes add ducted air conditioning, induction cooktops, pool heat pumps and EV chargers, and some reach the limit of what a single-phase supply can comfortably deliver.

Signs you might need more supply

  • The main switch or supply fuse trips when several large appliances run together
  • Lights dim when the air conditioning or oven starts
  • You are planning a fast EV charger, ducted air conditioning or a pool heat pump
  • You run workshop machinery, a lift or commercial kitchen equipment
  • An electrician or appliance installer has said the supply is too small

Three-phase is not always the answer. Sometimes upgrading the consumer mains on single phase, or managing loads, solves the problem for less. A proper load assessment comes first.

How the upgrade works

  1. Load assessment: we look at your existing supply and planned appliances.
  2. Application: the connection change is applied for with the network operator.
  3. Metering: your electricity retailer arranges a suitable three-phase meter through its metering provider. We coordinate timing.
  4. Installation: we upgrade the service line and consumer mains as a Level 2 ASP and fit a three-phase switchboard if needed.
  5. Energising and certification: the new supply is tested, energised and certified with a Certificate of Compliance for Electrical Work.

What affects the price

  • Whether the existing service line is overhead or underground, and its length
  • Whether the street network already has three phases available at your pole or pit
  • The condition and location of the meter box and switchboard
  • Trenching or boring for underground cabling
  • Any asbestos meter panels that must be removed

Every property is different, so we quote after a site check. Call us to talk through your plans, or send photos of your meter box and switchboard for an early indication.

Written by No.1 Electrical ServiceFamily-owned Level 2 ASP accredited electrical contractors in Sydney since 2010. Licence 94978C, ASP No. 2360.